Tiny Free House Update

Michael spent the last two days working in the Tiny Free House and got the other window lowered about 8 inches to clear the eaves and finished adding pallet boards to the roof.

It was very slow going screwing all those boards to the trusses. Michael used an extension ladder from the outside for the lower boards and did the peak from the inside by coming up through the framing.

See more pictures and read his complete post here. Michael is hoping to get the tiny free house inclosed before the rains start so stay tuned with his blog for updates.

Picture-4-600x482

by Kent Griswold (Tiny House Blog)

If you enjoyed this post, subscribe to our feed

1 thought on “Tiny Free House Update”

Leave a Comment